Despite a challenging month of wind and rain, all foundations are now complete along with steel frames and the pool construction. The 1st floor concrete slabs have been cast and good progress is being made on the below slab drainage in readiness of the ground floor slab preparation.
Keep an eye out for updates in the New Year, including the swimming pool being filled and tested!
Please see some progress photos below plus a time-lapse video!